Laporan Shift 3 (23:00–07:00) · 19 October 2026
Total Batch
2,251
Total OK
2,213
Reject (U+O)
38
OK Rate
98.3%
Avg Cpk
1.013
Total Berat
56.254 ton
Detail per Mesin
| Tag | Line | Batch | OK | Under | Over | OK% | Avg (kg) | Min | Max | Std Dev | Cpk | OEE% | Avg Cycle |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Z-1804A | Line A | 452 | 452 | 0 | 0 | 100% | 25.0082 | 24.788 | 25.231 | 0.06464 | 1.247 | 96% | 8s |
| Z-1804B | Line A | 450 | 450 | 0 | 0 | 100% | 24.9931 | 24.764 | 25.235 | 0.08739 | 0.927 | 88% | 8s |
| Z-1804C | Line B | 450 | 450 | 0 | 0 | 100% | 25.0190 | 24.855 | 25.168 | 0.05821 | 1.323 | 96.7% | 8s |
| Z-1804D | Line B | 450 | 413 | 34 | 3 | 91.8% | 24.9293 | 24.510 | 25.313 | 0.12652 | 0.472 | 74.3% | 8s |
| Z-1804E | Line C | 449 | 448 | 1 | 0 | 99.8% | 25.0033 | 24.715 | 25.208 | 0.07515 | 1.094 | 94.5% | 8s |
| TOTAL | 2,251 | 2,213 | 35 | 3 | 98.3% | — | Avg Cpk: 1.013 | 56.254 ton | |||||